Logo BIS VAM Anlagentechnik GmbH
You are:      Home     References     Underground Piping     References Underground Pipework
Bereiche
 

Underground Piping

References Pipelines

Project „UGS 7 Fields“ / Austria

Scope of services:

  • Erection of natural gas storage facilities at 3 different locations (Nußdorf Süd, Nußdorf Nord, Zagling) with compressor units

1.700 tonnes equipment
890 tonnes pipes
DN ½“ to DN 24“
Material: A 350, P 355, P460, 1.4571
Pressure up to ANSI Class 1500
1.500 pieces of measuring and control technology
Orderer: Rohöl-Aufsuchungs Aktiengesellschaft
Period of time for erection: September 2009 – 2010


Project „7 Fields - RAG“ / Austria

Scope of services consortium Streicher-BIS VAM:

  • Pipe fitting for the following construction sections:
    • Section 1: Nussdorf – Auerbach 19 km DN 600 / 24“
    • Section 2: Auerbach – Zagling 27 km DN 600 / 24“
    • Section 3: Auerbach – Haiming 25 km DN 900 / 36“

Material: L 480 MB
Orderer: Max Streicher GmbH & Co KG
Period of time for realization: 2009 – 2010


Natural gas pipeline Redlham-Offenhausen / Austria

Scope of services:

  • Erection of a natural gas high pressure pipeline

Length: 16 km
Pressure: PN 70
Dimensions: 323,9 mm x 6,3 mm
Material: L360NB
Orderer: Oberösterreichische Ferngas AG
Period of time for erection: May – July 2006


Natural gas pipeline Zillertal / Austria

Scope of services:

  • Erection of the natural gas high pressure pipe „SL9Z Zillertal“ von Schlitters nach Uderns

6,5 km DN 250 230,0 x 5,0 St. 37,0 PN with PE Insulation
7 km PE Natural gas supply line DN 50 to DN 150
Orderer: TIGAS Erdgas Tirol GmbH
Period of time for erection: November – December 2005


Natural gas pipeline Imst / Austria

Scope of services:

  • Erection of a natural gas pipeline

Length: 10,5 km
Diameter: 273 mm x 5 mm
Outside insulation: DIN 30670/30672 – partial fiber cement
Material: St 37.0
Operating pressure: 4 bar
Orderer: TIGAS Erdgas Tirol GmbH
Period of time for erection: April – July 2005


Natural gas high pressure pipeline - „Pyhrn“ Section B / Austria

Scope of services:

  • Erection of the pipeline from Klaus to St. Pankraz, Upper Austria

Total length: 9 km, DN 400 / PN 70
Most difficult pipe laying on mountains, approx. 4 km pipe laying in a lake
2 culverts (Steyr, Teichl),
Material: STE 360.7
Length of pipeline in country: 5.333 m
Length of pipeline in the storage lake: 3.733 m
Orderer: Oberösterreichische Ferngas AG
Period of time of realization: Autumn 1997


ZurückSeite weiterempfehlennach oben