VASCOIL 2 / Austria

Scope of services:

  • Refurbishment of the downcoilers of the hot rolling mill in Linz (Consortium with Siemens VAI)
  • Supply of approx. 670 tonnes equipment Revamp of the downcoiler 3, 4 & 5 during shut downs (16 days each)

Orderer: Siemens VAI
End customer: voestalpine Stahl
Period of time for realization: 2009 – 2012 


Crop Shear / Austria

Scope of services:

Crop shear unit

  • Erection of approx. 1.800 tonnes mechanical equipment and 200 tonnes technological steel structure

Orderer: Siemens VAI
End costumer: voestalpine Stahl
Period of time for realization: 2006 – 2007


ESP Taranto / Italy

Scope of services:

  • Demolishing of the roof and the internal parts of the existing filter
  • Extension for the filter casing
  • Installation of the internal equipment
  • Erection of a new roof
  • Dismantling of existing filter 400 tonnes
  • Installation Steel structure 350 tonnes
  • Installation internal parts 400 tonnes

Orderer: GE-Germany
End costumer: ILVA / Taranto
Period of time for realization: 2007


Reactor Borealis / Germany

Scope of services:

  • Fabrication of a high pressure vessel

Length: 32,3 m; Ø= 7,0 m
Pressure: 46 bar
Weight: 167,3 tonnes
Orderer: Borealis
Period of time for realization: 2006


Blast Furnace Donawitz / Austria

Scope of services:

  • Yearly continuous maintenance works over a period of more than 30 years

Orderer: voestalpine Stahl 

 

 


Rail Rolling Mill / Austria

Scope of services:

  • Disassembling of a rail rolling Mill
  • 5.000 tonnes within 5 days

Orderer: voestalpine Schiene
Period of time for realization: 2005


ESP „AF 20“ / Austria

Scope of services:

  • Dismantling of the roof section incl. internals, rebuilding/ erection for electrostatic precipitator

Weight: disassembling 140 tonnes
Assembling: 190 tonnes
Shut down time: 29 days
Orderer: BHA Gruppe
Period of time for realization: 2009 – 2011


ESP „AF 40“ / Austria

Scope of services:

  • Erection of a new ESP (electrostatic precipitator)

Weight steel structure: 260 tonnes
Weight internal parts: 110 tonnes
Orderer: BHA Gruppe
Period of time for realization: 2004 – 2005


Sintering Plant / Austria

Scope of services:

  • Extension of Sinter Plant with new cooler and sinter conveyor

Erection weight: 2.500 tonnes
Plant downtime: 20 days
Orderer: voestalpine Stahl
Period of time for realization: 2004 – 2005


Blast furnance „A“ / Austria

Scope of services:

  • De-erection of old blast furnace, fabrication and erection of new blast furnace
  • De-erection and erection of charging, bleeder construction and hot-blast line
  • Reconstruction of hot-blast stove, gas cleaning, gas scrubber and replacement of sound absorber
  • De-erection: approx. 3.500 tonnes
  • Total weight erection: approx. 5.000 tonnes

Shut down time: 100 days
Orderer: voestalpine Stahl
Period of time for realization: 2003 – 2004


Blast Furnace 5 & 6 / Austria

Scope of services:
Revamping of the blast furnaces

  • Shut down time: 6 months
  • Replacement of cladding sheet
  • Lifting of remained tank
  • Height: 14 m
  • Weight: approx. 1.000 tonnes

Orderer: voestalpine Stahl
Period of time for realization: 2000 – 2001


Steel Converter No. 7, 8 & 9 / Austria

Scope of services:

  • Change of 2 steel converters (LD III) including change of bearing ring segments

Shut down time: 22 instead of planned 26 days
Orderer: SMSD
End customer: voestalpine Stahl
Period of time for realization: 2001


Rehabilitation Railway station Wuppertal / Germany

Scope of services:

  • Reconstruction of route over land and parts over water
  • Manufacture and erection of steel structure for the Railway station
  • Vohwinkel, Sonnborn, Bruch, Hammerstein and Landgericht
  • Revitalisation “Stütze 100”

Orderer: Wuppertaler Schwebebahn
Projects: 1998 – 2010


Construction of a distribution center / Austria

Scope of services:

  • Construction of a distribution center as a general contractor, including the integration of existing offices and maintenance buildings
  • Steel construction with integrated platforms for a total warehouse area of about 3.900 m²

Orderer: MCE Gerätetechnik
Period of time for realization: 2009

 


Steel Service Center / Austria

Scope of services:

  • Erection of a warehouse for incoming material and a production hall for sheet metal working incl. modern staff facilities and a cut-to-length line incl. office

Orderer: voestalpine Stahl Service Center (SSC)
Period of time for realization: 2005 – 2006


General reconstruction of main station Frankfurt a.M. / Germany

Scope of services:

  • General contractor for the complete reconstruction of five platform halls under monumental protection
  • Renewal of 5.000 tonnes steel, 60.000 m² roof and wall covering
  • Reduction of construction time by 6 months

Orderer: DB Station & Service AG
Period of time for realization: 2002 – 2006

 