Plant Engineering - Pipework for Power Plants
References Steam Power PlantsReferences Steam Power Plants

Scope of Services:
Material: X10CrWMoVNb9-2 (P92), 10CrMo9-10, 13CrMo4-5, 16Mo3
Total Weight: 1.150 tonnes (pipes and fittings)
Orderer: E.ON Benelux
Period of time for realization: July 2009 – September 2012

Scope of services:
Total BoP piping systems:
Total weight: approx. 800 tonnes
Total length: approx. 17.400 m
Material: P91, WB36, 16Mo3, P235 GH, 1.4571
Diameter: DN 15 to DN 1600
Orderer: Siemens AG, Erlangen
Client: Electrabel S.A.
Period of time for realization: February 2008 – November 2009

Scope of services Consortium MCE ET/BIS VAM:
Middle- and low pressure piping systems:
Weight (without valves): approx. 380 tonnes
Length: approx. 4.700 m
Dimensions piping: DN 25 to DN 900
Material: P235GH, CrNi Material, PP
Orderer: RWE Power AG
Contractor: Consortium Babcock Borsig Service GmbH / MCE Energietechnik GmbH/BIS VAM
Period of time for realization: May 2008 – July 2012

Scope of services:
Total BoP piping systems:
Total weight pipes: approx. 1.300 tonnes
Material: P91, 16Mo3, P235GH, 1.4571, 10CrMo910
Orderer: Salzgitter Flachstahl GmbH
Period of time for realization: 2007 – 2010

Scope of services:
High pressure piping systems:
Material: X10CrWMoVNb9-2 (P92),10CrMo9-10, 13CrMo4-5, 16Mo3
Total Weight: 860 tonnes (pipes and supports)
Orderer: E.ON Kraftwerke GmbH
Contractor: Consortium E.ON Anlagenservice / BIS VAM (each 50 %)
Period of time for realization: September 2007 – April 2011

Scope of services consortium MCE ET/ BIS VAM:
Middle- and low pressure piping systems:
Weight (without valves): approx. 670 tonnes
Length: 22.000 m
Dimensions piping: up to DN 1200
Material: Carbon Steel, Stainless Steel
Orderer: RWE Power AG
Contractor: Consortium Babcock Borsig Service GmbH / MCE Energietechnik GmbH / BIS VAM
Period of time for realization: August 2007 – December 2009

Scope of services:
Main cooling water pipeline:
Total Weight: 1.375 tonnes
Material: P235GH, P235TR2, P265CH, 1.4401
Orderer: RWE Power AG
Contractor: Consortium MCE Energietechnik / BIS VAM
Period of time for realization: November 2006 – July 2010

Scope of services:
Weight: 1.033 tonnes
Material: P235GH, P265GH, 1.4301, 1.4539
Orderer: Siemens AG
Project period: April 2005 – June 2009
Main erection period: August 2007 – November 2008

Scope of services:
Total BoP piping systems:
Material: A 335-P91, A 335-P22, A 335-P11, A 691-1Cr, 15NiCu MoNb5,
1.4903, 1.4539,15 Mo3, Carbon steel, GRP, A 312 TP 304 L
Dimension: ½” up to 102”
Weight: 3.885 tonnes
Orderer: Siemens AG
Client: Isken
Period of time for realization: July 2000 – September 2003