Maasvlakte Power Plant 3 High pressure - Piping systems / The Nederlands

Scope of Services:

  • Detailengineering of „hot reheat-“ and „cold reheat-“ piping systems
  • Fabrication of high pressure Induction-bends
  • Supply of small bore pipes, nozzles, lugs and supports
  • Erection of „hot reheat-“ and „cold reheat-“ piping systems

Material: X10CrWMoVNb9-2 (P92), 10CrMo9-10, 13CrMo4-5, 16Mo3
Total Weight: 1.150 tonnes (pipes and fittings)
Orderer: E.ON Benelux
Period of time for realization: July 2009 – September 2012


Steam Power Plant Gent / Belgium

Scope of services:
Total BoP piping systems:

  • Detailengineering
  • supply
  • fabrication and
  • erection of the power plant piping systems

Total weight: approx. 800 tonnes
Total length: approx. 17.400 m
Material: P91, WB36, 16Mo3, P235 GH, 1.4571
Diameter: DN 15 to DN 1600
Orderer: Siemens AG, Erlangen
Client: Electrabel S.A.
Period of time for realization: February 2008 – November 2009


PP Westfalen – Generating unit D+E / Germany

Scope of services Consortium MCE ET/BIS VAM:
Middle- and low pressure piping systems:

  • Detailengineering
  • supply
  • prefabrication and
  • erection incl. start up and commissioning

Weight (without valves): approx. 380 tonnes
Length: approx. 4.700 m
Dimensions piping: DN 25 to DN 900
Material: P235GH, CrNi Material, PP
Orderer: RWE Power AG
Contractor: Consortium Babcock Borsig Service GmbH / MCE Energietechnik GmbH/BIS VAM
Period of time for realization: May 2008 – July 2012


Steam Power Plant Salzgitter „Power Plant 2010“ / Germany

Scope of services:

Total BoP piping systems:

  • Basic engineering
  • detailengineering
  • prefabrication
  • supply and
  • erection

Total weight pipes: approx. 1.300 tonnes
Material: P91, 16Mo3, P235GH, 1.4571, 10CrMo910
Orderer: Salzgitter Flachstahl GmbH
Period of time for realization: 2007 – 2010


Hard Coal Power Plant Datteln 4 / Germany

Scope of services:
High pressure piping systems:

  • Detailengineering
  • Supply of nozzles and lugs and fittings
  • Fabrication of high pressure bends
  • Erection

Material: X10CrWMoVNb9-2 (P92),10CrMo9-10, 13CrMo4-5, 16Mo3
Total Weight: 860 tonnes (pipes and supports)
Orderer: E.ON Kraftwerke GmbH
Contractor: Consortium E.ON Anlagenservice / BIS VAM (each 50 %)
Period of time for realization: September 2007 – April 2011


PP Neurath „BoA power plant units 2/3“
Generating unit F+G / Germany

Scope of services consortium MCE ET/ BIS VAM:

Middle- and low pressure piping systems:

  • Detailengineering
  • supply
  • prefabrication and
  • erection of LOT 2

Weight (without valves): approx. 670 tonnes
Length: 22.000 m
Dimensions piping: up to DN 1200
Material: Carbon Steel, Stainless Steel
Orderer: RWE Power AG
Contractor: Consortium Babcock Borsig Service GmbH / MCE Energietechnik GmbH / BIS VAM
Period of time for realization: August 2007 – December 2009


PP Neurath „BoA power plant units 2/3“
Generating unit F+G / Germany

Scope of services:
Main cooling water pipeline:

  • Detailengineering
  • Supply of pipes
  • fittings
  • compensators supports and valves
  • Prefabrication
  • Erection

Total Weight: 1.375 tonnes
Material: P235GH, P235TR2, P265CH, 1.4401
Orderer: RWE Power AG
Contractor: Consortium MCE Energietechnik / BIS VAM
Period of time for realization: November 2006 – July 2010


Olkiluoto 3 – NPP – Lot 3 / Finland

Scope of services:

  • Detailengineering
  • Supply of material
  • Prefabrication
  • Erection of all open and closed cooling water systems 

Weight: 1.033 tonnes
Material: P235GH, P265GH, 1.4301, 1.4539
Orderer: Siemens AG
Project period:  April 2005 – June 2009
Main erection period: August 2007 – November 2008


ISKENDERUN - Coal Fired Power Plant / Turkey

Scope of services:
Total BoP piping systems:

  • Detailengineering
  • prefabrication and
  • supply of pipes, fittings, insulation, compensators, supports, spring hangers

Material: A 335-P91, A 335-P22, A 335-P11, A 691-1Cr, 15NiCu MoNb5,
1.4903, 1.4539,15 Mo3, Carbon steel, GRP, A 312 TP 304 L
Dimension: ½” up to 102”
Weight: 3.885 tonnes
Orderer: Siemens AG
Client: Isken
Period of time for realization: July 2000 – September 2003